Roof repair or replacement in Troy and Oakland County: start with the written scope
A planned free matching service for homeowners — not a roofer — introducing one named independent contractor at a time. You would approve that name and information sharing; contact details would stay locked until the contractor accepts. Matching is closed here.
Water has appeared on an indoor surface; the source and repair have not yet been assessed.
The next useful result is an explanation of the source and the proposed repair. The assessment should explain where water enters and why the proposed repair fits. The scope should state what is repaired and its limits. That finding comes before choosing repair or replacement.
Use existing indoor or ground-level observations. Do not climb onto the roof to use this page. Requests are not open yet. The guides are free to use.
A household is considering new roof covering, but has not agreed a complete scope. Roof age or visible wear still needs an assessment explaining why the proposed remedy fits the condition.
Choosing the covering is one decision; defining the installation is another. In the example below, removal, hidden decking work and chimney flashing need separate written treatment. Include protection, cleanup, warranty responsibility, milestones and exclusions in the complete proposal.
The excerpts show how a broad label can leave work undefined. They are invented teaching examples, not provider offers or a recommendation.
REPLACEMENT SCOPESAMPLE 01 / READ THE WORDING
01
What comes off?
“Remove existing roofing.”
“Remove one existing layer of asphalt shingles; load and dispose of removed material.”
02
What if the wood is damaged?
“Decking as needed, extra.”
“Identify the replacement decking material and quoted price per sheet; obtain written homeowner approval before additional work.”
03
What happens at the chimney?
“Flashing included.”
“Identify existing chimney flashing to retain, repair or replace; document each transition and its included work.”
Read the complete scope together.
Check ventilation, material identifiers, protection, cleanup, warranty responsibility, payment milestones, schedule and exclusions. A more detailed excerpt alone does not prove a contractor is qualified.
How does extra decking change the total?
Base quote + (additional units × quoted unit price).
Use the units and rate in your actual proposal. Count only work outside the base scope; adding an allowance already included in the base counts it twice. Hidden conditions still need assessment and agreed change-order terms.